REJUVENATIyogababe.onlineWELLNESS · SELF-DISCOVERY · INFORMED CURIOSITY

science · SOURCE BATCH2-006

A Practical Guide to Free-Energy Devices — Patrick J. Kelly

attributed reading edition with marked omissions · 1875 source pages · 1965 native web sections · 742,091 published words

Open first-party PDF viewer

Attributed source edition with marked privacy/code omissions. Original PDF page numbers apply in this viewer.

Contents and coverage · All reading editions · Explanatory guides · Source metadata

Editorial commentary and evidence checks for this source

Check definitions, measurements and the difference between a model, a reported simulation and independently reproduced evidence. Spiritual or speculative interpretations do not become physical or clinical findings through notation.

A Practical Guide to Free-Energy Devices — Patrick J. Kelly — evidence guide

A large technical compilation mixes ordinary electrical mechanisms with unvalidated excess-energy claims. Require complete energy accounting, independent replication and safe experimental design.

An archive is a starting point, not an automatic truth certificate. A large technical compilation mixes ordinary electrical mechanisms with unvalidated excess-energy claims. Require complete energy accounting, independent replication and safe experimental design.

Full commentary and investigation questions

The source text is preserved as attributed material; commentary does not rewrite an allegation into a verified finding.

Source page 381 · section 394/1965 · approximately 3 minutes

9 - 32

9 - 32
aligned. The spacers will be more effective if the ends are given a thin layer of the Sikaflex 291 bedding
compound before the ends get compressed against the cylinder walls.

Do the same for the four-inch pipe, pushing tightly squeezed natural rubber insulators strips between the
three-inch and four-inch pipes. Place them directly outside the insulators between the two-inch and three-
inch pipes so that when viewed from the end, it looks as if the rubber forms a single strip running through the
middle pipe:

Spark off each of the cylinders in the inner assembly. This is done by connecting a 12V battery negative to
the inside surface (only) at the bottom of the tube and with a wire from the battery positive, sparking the
outside surface of the cylinder at the top of the tube. Give each four sparks in rapid succession.

If you are using a bolt rather than a machined spigot, insert the stainless steel bolt and washer through the
bottom of the base to the central pipe. Wedge the bolt in place by inserting a piece of the dowel, or some
similar material into the centre of the 2-inch pipe and tape it temporarily in place. Alternatively, force the
innermost cylinder tightly over the machined plinth. Turn the inner pipe assembly upside down and place the
full-depth UMWP plastic washer on the threaded shaft. Apply a thin layer of white Sikaflex 291 bonding
compound to the face of one of the shaped UMWP washers and place it on the threaded shaft with the
bonding compound facing upwards.

Carefully clean the surface of the base plate of the outer casing around the central hole, both inside and
outside. Under no circumstances use sandpaper or wet-and-dry paper, here or anywhere else, as these
abrade and score the surface of the steel and have a major negative effect on the operation of the Cell.
Carefully lower the 5-inch outer casing on to the assembly so that the threaded shaft goes through the
central hole and the shaped washer fits tightly into the hole in the base of the outer housing. Apply a thin
layer of the bonding compound to the face of the second shaped washer, place it over the shaft of the bolt
and press it firmly into place to completely seal the hole in the base plate. Add a stainless steel washer and
bolt and tighten the bolt to lock the assembly together. If using a bolt, a long-reach box spanner may be
needed inside the central pipe for tightening the locking bolt. If one is not available, use a longer bolt
through the washers, screw a second nut up on to the shank of the bolt, file two flats on the end of the bolt,
clamp them in a vice to hold the bolt securely and tighten the locking nut. When the spare nut is unscrewed,
it pushes any damaged fragments of the bolt thread back into place.

Finish the assembly by adding three further rubber insulators between the top of the 4-inch tube and the
outer 5-inch casing. Use a thin layer of Sikaflex 291 bonding compound on the cut faces of the insulators as
this improves the insulation. Line the new insulators up with the insulators already in place and make them a
tight fit. These extra insulators support the end of the tube assembly and reduce the stress on the plinth
fitting at the base of the central tube when the unit is subjected to knocks and vibration when the vehicle is in
motion.

This full section as JSON

Congratulations. You’ve won a support ticket.

Your prize is an email address. No purchase required—but coffee helps keep this place online.

Open a support ticket: azmin@zedec.ai

Support and privacy requests are free. Response times are not guaranteed.

The ceremonial small print

“Due to unusual call volume and support volume, we are experiencing longer than normal wait times for a response.” This is our satirical holding message, not a measured queue report. We offer email support.

America runs on coffee, Britain puts the kettle on, and the opium trade reminds us that empires have had considerably worse business plans.

Donation is optional. No prize draw, purchase verification or guaranteed response is involved. Mandatory legal response duties still apply.

Public-interest research, not a spy drop. We keep 18 U.S.C. § 793 on the reading list—and restricted material off the guest list.

Site support and inquiries are welcome: azmin@zedec.ai. We reserve the right to remain silent, subject to legally required responses.